Septic Replacement
When a septic system fails, we install the new tank or drain field the county's repair permit calls for. Call or text (336) 516-7170 for a free quote.
Learn More
Yanceyville is the county seat of Caswell County, a town of 1,937 people at the 2020 census. Town sewer reaches part of the area, so ask the town whether it reaches your lot. Town water does not settle it: a 2024 state report counted 132 town water connections with septic systems. Where sewer stops, a new house depends on septic system installation, and a failed system calls for a new one.
Yanceyville sits about 22 miles north of Burlington, where JRC Construction is based. Yanceyville is part of our service area, and we offer septic system installation for new houses and failed systems. Where trees or brush cover a lot, our land clearing can open it up before the county's visit. Call or text (336) 516-7170 to ask for a free quote in writing.
Tell us about the septic system, lot, driveway, teardown or home project and where it is. We look at the job and put your free quote in writing.
Yanceyville's business district centers on Court Square and the old Caswell County Courthouse, built between 1858 and 1861. In the 1800s the town was a hub of the county's bright leaf tobacco economy. Today it covers just under 7 square miles at the center of the county. Census estimates for July 2025 put 20,537 of the county's 22,563 people outside its two towns, Yanceyville and Milton.
The state's Local Water Supply Plan for 2024 listed 725 sewer connections in the Yanceyville system. The same report listed 132 water service connections with septic systems. Both numbers date from 2024, so read them as a snapshot and not as today's count.
Before you buy a lot or plan a system, ask Town Hall whether sewer can serve the parcel. Our guide to septic vs sewer costs compares the two. With no line to connect to, a house needs a septic system under county permits. Town water comes from Country Line Creek at S.R. Farmer Lake, a 365-acre reservoir finished in 1986.
Caswell County Environmental Health has its office on County Park Road in Yanceyville. Its On-Site Wastewater Program oversees the site evaluations, issues permits and conducts inspections. The property owner or the owner's legal representative signs the application. We do not pull or handle permits for anyone.
One form covers the Improvement Permit first and the Construction Authorization after it. Caswell's form calls the second one the Authorization to Construct. It covers a new house, an expansion of an existing system or a repair to a malfunctioning one. You list the bedrooms and the water source: new well, existing well, community well, public water or spring.
Your attachment sets the permit's life: 60 months on a complete site plan, no expiration on a complete plat. The form says the permits become invalid if the application changes or the site is altered. With the permits in place, a septic system installation is often a one-day job. A county inspection comes before soil covers the system, and the Operation Permit follows.
Caswell schedules no evaluation until the application and the site plan are complete. All proposed items must also be marked on the property. The form's Site Plan Worksheet lists what to draw. Show the property's dimensions and every planned structure, with its distance from the road and the side line.
Add the spot you prefer for the septic system, the driveway, the well and a north arrow. State rules set a 50-foot minimum between a septic system and a private drinking water well serving one home. Show existing septic systems and wells, including any on the adjoining property within 100 feet of your line. Easements, rights of way and wetlands go on too, and the county returns incomplete plans.
The form makes the applicant solely responsible for labeling all property lines and corners and making the site accessible. Clear what the county must reach before the evaluation, since the form says an altered site can void the permits. State rules let the county ask the owner for pits, and digging them is excavation work we do. Once the septic area is set, the driveway on your plan can become a gravel driveway.
Census estimates date the median home to 1973 in town and 1981 in Caswell County. An original septic system on a home that age would be more than 40 years old.
Outside the zoned areas, Caswell's planning page lists a minimum lot of 1 acre of usable land. Lots in the Country Line Creek WS-II watershed, which feeds Farmer Lake, need more land. The minimum is 2 acres in the protected area and 3 in the critical area. The Hyco Lake zoning area lists 30,000 square feet, and the towns answer for lots inside them.
The county's Planning Department can tell you which rule fits your parcel. Watershed buffers along perennial waters are 30 feet undisturbed, then 50 more feet of vegetation. Outside zoned areas, setbacks are 50 feet in front on a state-maintained road, 15 at the sides and 25 behind. Those lines fix where the house sits, and the drain field and repair area need room of their own.
The USDA's official Clifford soil description comes from a wooded spot about 3.3 miles south of Yanceyville, near NC 62. It lists red clay from 17 to 48 inches down, with bedrock deeper than 60 inches. That is one spot, and state rules have soil read across both the first drain field and the repair area. The county's soil evaluation on your land decides the system.
Communities and areas we serve around Yanceyville: Court Square, Yanceyville Historic District, West Main Street, NC 62, NC 86, US 158, S.R. Farmer Lake, Country Line Creek, Hyco Lake, Milton, Piedmont Community College Caswell County Campus, Bartlett Yancey High School.
Yanceyville ZIP codes served: 27379.
Yanceyville is part of our service area. We look at the job first, then put a free quote in writing.
(336) 516-7170
When a septic system fails, we install the new tank or drain field the county's repair permit calls for. Call or text (336) 516-7170 for a free quote.
Learn More
Excavation for new house sites and the trenches for septic lines, within about 55 miles of Burlington. We look at the job and put a free quote in writing.
Learn More
We clear wooded lots and acreage for a new house or a pasture. The stumps come out with the trees, and the brush is hauled off.
Learn More
Yard grading for drainage and site grading before a build. We shape the ground so rain runs away from the house.
Learn More
New gravel driveways and extensions for homes and land around Burlington. We also regrade worn driveways and top them with fresh crush and run.
Learn More
We dig footings to the plan for new homes, additions, garages and porches around Burlington. The trenches are ready for the footing inspection before any concrete goes in.
Learn More
We take down houses, garages, barns and sheds around Burlington and haul off what comes down. Call or text for a free quote in writing.
Learn More
We load and haul off construction and demolition debris around Burlington. We also haul storm wood and the brush piles from clearing.
Learn More
Overgrown fields and fence lines cut back to open ground with machines. Most people around Burlington call it bush hogging.
Learn More
New homes, remodels, additions and repairs within about 30 miles of Burlington. On our own builds, the site work comes from our excavation side.
Learn MoreA few of the questions we hear most around Yanceyville. If yours is not here, call or text and ask.
Tell us where the job is and what you need done. Call or text (336) 516-7170, or send the form, for a free quote.
Tell us about the septic system, lot, driveway, teardown or home project and where it is. We look at the job and put your free quote in writing.